Report on Future Prospect of Solar Energy in Bangladesh

Report on Future Prospect of Solar Energy in Bangladesh

Introduction: 

As the time passes by, demand of energy is increasing with an increase in the world’s population. From different corporations to small households, people need energy to perform daily tasks. As the science and technology is developing, people’s lives are also becoming more complex .To meet energy demands, renewable energies such as solar is used besides other sources. This research intends to investigate whether there is any future prospect of solar energy in Bangladesh. It is an exploratory research.

1.Origin:

This report, “Future Prospect of Solar Energy in Bangladesh, is the outcome of the study conducted as a term paper requirement for the course Operations Management under the supervision of Dr. Muhammad Ziaulhaq Mamun in Institute of Business administration, DhakaUniversity.

2     Background:

To meet the current energy demand there is no alternative to renewable energies such as solar, wind, biomass etc besides other existing sources. Using solar energy, simply, is a process which can provide energy from the sun. In this process, energy of the sun in the shape of photons reaches to earth and meets the world energy demand of the whole year with just one minute’s solar radiation. Photovoltaic panel (PV panels-made of silicon) is the tool to harness solar energy.

Bangladesh is one of the densely populated countries which have not sufficient supply of energy. The present crisis in power supply hints at the troublesome time to come ahead. In Bangladesh, almost 80% of the people live in the village and only 32% of total population is connected to grid electricity (Rahman, 2006).In light of the present demand for electricity; by 2020 the energy mix will be changed considerably from what it is today. The possibilities of using solar power are already being tested and will mostly increase. But still, most households meet their daily needs with biomass fuel. The country’s electricity distribution board is failing to cope with the exponential growth in demand for power in the capital and all over the country. Therefore, the researchers intend to investigate whether there is any future prospect for solar energy in Bangladesh.

3. Statement of Problem:

Bangladesh has a large unsatisfied demand for energy, which is growing by 10 percent annually. Currently, it has the lowest per capita consumption of commercial energy in South Asia.  While the current installed capacity is 5320 megawatts, because of reduced efficiency of the old generating units the derated (effective) capacity stands at 4830 megawatts as of November 2008. As a result, the country has been unable to meet the growing demand for electricity. All parts of the country, including the capital, Dhaka, experience frequent planned electricity outages (USAID, Bangladesh; February 02, 2009).

A research conducted by Akter (1997) reveals that, though different organizations such as Rural electrification Board (REB), Atomic Energy Commission (AEC), Local Government Engineering Department (LGED), and Grameen Shakti (GS) have installed (are in the process of installation) a number of solar PV systems in different parts of the country, these are not widely used in rural and urban areas in Bangladesh. As Bangladesh is still very centralized to its capital, many locations outside the capital do not get the attention they need when it comes to the daily amenities, most prominent of them being a reliable source of electricity.

The above situation is also supported by a research where it is mentioned, for the near future, it is impossible to connect every remote village and offshore island to the national grid system. Since expanding the national grid in those isolated areas is very expensive and not cost effective, solar PV could be an effective alternative to fulfill the electricity demand in these off-grid areas (Ahammed & Taufiq, 2008).

The first solar PV–based rural electrification project in Bangladesh was initiated with the financial support of France, with a total installed capacity of 62 kilowatts peak (kWp), of which 29,414 kWp came from battery charge stations and the rest from SHS (Barua, Urmee, Kumar, and Bhattacharya, 2001).But solar PV systems do yet have broad market acceptance because of the existence of barriers arising from the need for large-scale implementation. The main obstacle is high initial costs. Lack of demonstration of the technology, limited awareness, and uncertainty over after-sales service are the other barriers in the promotion of solar energy– based electricity (Ahammed & Taufiq, 2008).

Under this situation, this research intends to evaluate the feasibility of the future of solar energy in Bangladesh as a substitute to present methods of energy acquiring is imperative for that cause.

4  .Purpose :              

The broad purpose of this research is to explore whether there is any future prospect of solar energy in Bangladesh. Moreover, some specific purposes of this exploratory research are –

  • To understand the socio-economic impact of solar energy in rural Bangladesh
  • To evaluate the impact of further growth in the solar energy sector on present power distribution system of Bangladesh,
  • To ascertain if there is a slow growth in the implementation of solar energy and propose recommendation to fix the problem

5.      Methodology:

Both primary and secondary sources are used for collecting information. The basis for primary information was interview of Grameen Shakti personnel in implementing the solar energy system in Bangladesh. For secondary data collection, websites, journals, articles and other statistical sources are used.

6     . Scope:

This research is conducted from operational point of view. Other aspects such as technical, financial and social aspects of the subject are considered as secondary concern for the report.

From statement of problem section, it is already mentioned that, rural areas are not properly electrified though city areas have already come under the circulation of electricity. More over there is no real time line when remote rural areas are going to come under the supply of electricity. So, rural areas are the primary concern of this research.

Another reason of choosing rural area is that, the concept of solar energy is yet new and most of the people in electrified areas will not be interested in using solar energy in alternate to their main source of power. Now days, some discussions are going on to consider solar PV in urban areas also.

7 .     Limitation:

There are three limitations in carrying out this research.

1. One of the obstructions of the study is accessibility. Getting appointment with Grameen Shakti was a bit tough.

2. The sample organization of interview for this research may be too small to represent the expert organizations.

3. Physical visit to rural areas (where solar energy program in already implemented) was not possible because of inconvenient location.

Review of Literature:

Bangladesh is endowed with ample supply of renewable sources of energy. Thus, energy is not a problem at all if alternative sources are used properly. According to Khalequzzaman (2007), solar power uses sun’s energy to produce electricity. Solar energy is plentiful in Bangladesh. Generation of electricity using solar power is environmentally feasible. Development of solar power should be a top priority for Bangladesh in the 21st century.

At present the national grid is serving only 50% of the nearly 10,000 rural markets and commercial centers in the country which are excellent market for centralized solar photovoltaic plants. Currently private diesel genset operators are serving in most of the off-grid rural markets and it has been found that 82% of them are also interested in marketing SHS in surrounding areas if some sorts of favorable financing arrangements are available [World Bank, 2000].

Islam and Islam (2005) said to their research that, throughout the country, different government administrative offices, NGO offices, health centers, schools, banks, police stations etc are functioning. In the off-grid locations, these offices are either using traditional means (lantern, candles, kerosene wick lamps etc.) or operating their own diesel gensets. These offices have separate budgets for electricity and they can be easily served with solar photovoltaic applications.

On the other hand, Islam (2008) has mentioned in his research article that, Bangladesh holds the potential to cost-effectively meet a significant fraction of its future electricity demand through the use of renewable generation technologies, possibly adding as much renewable capacity as the current overall electric power capacity of the country. Many parts of the country have favorable solar conditions and there are many potentially cost-effective applications. Islam also said in his article that, Bangladesh must develop a policy framework that allows and encourages private investors to develop renewable energy projects in order to realize the enormous potential of renewables. Bangladesh has got ample solar insolation throughout the country. Daily average solar radiation varies between 4 to 6.5 kWh/m2. Maximum amount of radiation is available on the month of March-April and minimum on December-January. There is bright prospect for applications of solar thermal and photovoltaic systems in the country.

A solar PV system is an important emerging option to supply electricity with quality light, reliable service, and long-term sustainability (Ibrahim, Anisuzzaman, and Kumar, 2002).Thus from the above other researches, it is apparent that, solar energy has the potential to be widely implemented if further researches are carried on.

Overview of the Present Power System:  

Since energy plays an important role in socio-economic development, the Government of Bangladesh is giving priority in overall development of the energy sector. About 20% of the total public sector investment was owed for the energy sector development during the last one decade (NEP, 2004, p.1). The primary energy source is natural gas and the electricity generation significantly relies on natural gas in Bangladesh.

 Energy Status:

About 80% of the installed electricity generation capacity is based on natural gas. In the year 2004-2005, the natural gas production was 13,783 MWh and the total installed electricity generation capacity was 4995 MW (BBS, 2007, p.240). In the same fiscal year, the total electricity generation was 22,006 million kWh and about 88.83% of the total generation used natural gas as primary fuel (ibid, p. 241). In spite of government initiative, the per capita commercial energy was 210 kg of oil equivalent (ADB, 2004, p.2). According to a published data of the BPDP on June, 2006, 42.09% of the population has the access of grid electricity and per capita electricity consumption is 162.92 kWh in Bangladesh. The per capita commercial energy and electricity consumption in Bangladesh is one of the lowest among the developing countries.

Primary Commercial Energy Resources:

The natural resources of Bangladesh comprises of natural gas, coal, peat, limestone, hard rock, lignite, silica sand, white clay etc (Islam, 2001, p.10). Bangladesh has significant amount of natural gas reserve and thereby among other commercial energy sources natural gas plays the major role. The natural gas contributes about 70% of the overall commercial energy sources and the rest comes from imported oil, coal and hydropower production (Draft NEP, 2006, p.1). Bangladesh has natural gas reserve of about 14.607 TCF (BBS, 2007, p.9 http://www.bpdb.gov.bd/distribution.htm).The total coal and peat deposit are about 1750 million tons and 170 million tons respectively (Islam, 2001).

In 2002, the local production of natural gas meets the country’s demand but the coal and petroleum products need to be imported from other countries in order to meet the local demand. In the fiscal year 2004-2005, the consumption of natural gas, petroleum and coal was 456, 465 and 2 trillion BTU respectively (BBS, 2007, p.151).The domestic consumption of the commercial energy in the same fiscal year was 163.43 trillion BTU (ibid, p. 252).

Bangladesh is endowed with rich solar potential, and sunlight is available throughout the year.

Bangladesh receives 900 X 1018 joules of solar energy annually and the availability of solar energy per square meter is 193 W whereas the consumption per square meter is only 0.17 W

(Haq et al., 2005, p.3). This implies the abundance of solar energy in Bangladesh.

 Status of Solar Energy1 :    

The solar thermal energy is used in conventional ways for drying of washed clothes, food grains, fish, vegetable, raw jute etc for centuries in Bangladesh. Locally this energy is also used for evaporation of saline water for salt production in the coastal region. The long term average sunshine data indicates that the bright sunshine is available for 3 to 11 hours daily in the coastal region of Bangladesh. The solar radiation varies from 3.8 kWh/m²/day to 6.4 kWh/m²/day throughout the country. According to these data, Bangladesh has high potential of solar thermal and photovoltaic applications .This immense potential of solar energy provides an opportunity for off-grid rural electrification through utilization of photovoltaic technology. The conventional solar thermal applications are cooking, drying, hot water production and others.

Bangladesh is endowed with rich solar potential, and sunlight is available throughout the year.

Bangladesh receives 900 X 1018 joules of solar energy annually and the availability of solar energy per square meter is 193 W whereas the consumption per square meter is only 0.17 W

(Haq et al., 2005, p.3). This implies the abundance of solar energy in Bangladesh. The monthly solar radiation in different locations of Bangladesh is given in table 1.

Table 1: Monthly Solar Insulation at different locations of Bangladesh (in kWh/m²/day)

MonthDhakaRajshahiSylhetBograBarisalJessore
January4.033.9644.014.174.25
February4.784.474.634.694.814.85
March5.335.885.25.685.34.5
April5.716.245.245.875.946.23
May5.716.175.376.025.756.09
June4.85.254.535.264.395.12
July4.414.794.144.344.24.81
August4.825.164.564.844.424.93
September4.414.964.074.674.484.57
October4.614.884.614.654.714.68
November4.274.424.324.354.354.24
December3.923.823.853.873.953.97
Average4.7354.544.854.714.85

Source:  Secondary,www.lged-rein.org/solar/solar_rerc. htm, printed 14.07. 2007

From the above table it is seen that maximum solar radiation is available from March to May whereas minimum solar radiation is available during the month of December and January.

Common Application of PV technology for Rural Electrification:

Bangladesh has a shortage of electricity generation and about 70% of the total population doesn’t have access to electricity. For a developing country like Bangladesh it is not possible to bring the whole country under a common grid network and moreover financially and technically that is not feasible. In order to reduce harmful environmental effects of conventional electricity generation different government organizations, NGOs and educational institutions are engaged to promote diversified application of renewable energy for rural electrification. Commercial application of PV started in Bangladesh in late eighties. The SHS is a proven technology for off-grid electrification in rural areas in Bangladesh whereas the centralized PV system is comparatively new concept of rural electrification. The application of PV technology for rural electrification in Bangladesh is shown in the table 2.

Table 2: Application of PV for Rural Electrification in Bangladesh

Application of PV technology for rural areas

Modes of electrification

  1. Power supplies to remote villages
  1. Lighting and power supplies for remote

buildings Battery charging stations

  1. Stand alone solar home system
  2. Centralized PV system

 Source: Secondary, Rahman (2006), p.53

 Organizations Engaged in Dissemination of PV technology:

The heart of the solar PV system is the solar panel and in Bangladesh the solar panels for PV applications are imported from other countries. However conventional storage batteries for SHSs are produced by local manufacturers. But for large PV application like the centralized system, storage batteries and inverters are imported from foreign countries. Most of the CCUs for SHS applications are locally produced and few of them are imported from outside Bangladesh. Different government, non-government organizations and educational institutions are engaged in dissemination of PV technology in Bangladesh. In this section some of them who plays major role in dissemination of PV technology in Bangladesh will be discussed.

Grameen Shakti:

Grameen Shakti is one of the pioneer private organizations in the renewable energy sector in Bangladesh. It was established in 1996 and the main motto of it is to promote, popularize and disseminate renewable energy technology at an affordable price to the rural area of Bangladesh. In order to promote renewable energy in rural areas, the Grameen Shakti has set up unit offices in different parts of Bangladesh and so far it has 189 unit offices50. Till May, 2006 it has installed 65000 SHS with approximately 4, 00,000 beneficiaries and so far covered 20,000 villages and 11 remote islands in Bangladesh (ibid). Since SHS is comparatively expensive technology therefore Grameen Shakti has introduced soft loan credit facilities for rural consumers.

 Infrastructure Development Company Limited (IDCOL):

IDCOL is a non bank financial institution which was incorporated as a public limited company on 14th May, 1997 with the assistance from the World Bank under Private Sector Infrastructure Development Project. The primary objective of the company is to promote the significant participation of the private sector in investment and operation, ownership and maintenance of new infrastructure facilities. IDCOL has access to resources provided by the WB, GTZ, KfW, SNV-Netherlands Development and the Government of Bangladesh (ibid). It promotes renewable energy programs through 15 partner organizations (PO) and moreover provides technical, logistic, promotional and training assistance to the POs. These POs are private organizations who are engaged in dissemination of solar technology in Bangladesh. It supports the rural electrification by means of SHS under the Rural Electrification and Renewable Energy Development Project (REREDP) (ibid). The REREDP is jointly financed by the IDA, GEF and KfW and it has set a target of financing installation of 200,000 SHSs by 2009 (ibid). The SHSs are sold (mostly through micro-credit) by POs to the households and business entities in the remote and rural areas of Bangladesh (ibid). The IDCOL provides refinancing facility to the POs and channel grants to reduce the SHSs costs (ibid). For installation of SHS, it promotes standard technical specifications and approved equipment list for POs.

Rahim Afrooz:

Rahim Afrooz solar is a sister organization of Rahim Afrooz group. It engages in projects related to SHS installations and centralized PV system in Bangladesh. It provides equipments related to PV system to different organizations in Bangladesh. Though it imports solar panels from foreign countries but the RahimAfrooz battery, another sister organization manufactures batteries for solar PV application and other purposes. It acted as a local agent for installation of the centralized PV projects of the BPDB and LGED. It is so far the largest deep cycle battery provider for SHS in Bangladesh. It contributes in dissemination of SHS in partnership with local NGOs. Recently the Rahim Afroz Battery has introduced the battery recycling unit along with its battery manufacturing plant. Therefore the batteries of the SHS installations can be recycled after lifetime and this is the first battery recycling unit in Bangladesh.

Bangladesh Advancement Committee (BRAC):

BRAC is one of the pioneer organizations in dissemination of PV technology in Bangladesh. It was established in 1972 and it launched solar energy program for sustainable development in December, 1997. Until June 2004, the BRAC has installed SHSs of total 263.545 kWp capacities. The future goals of the BRAC are to increase the number of SHS installations, implement solar energy complex and solar energy institute.

Rural Electrification Board (REB):

The Rural Electrification Board has started its operation with the vision of rural electrification in 1978. It has successfully implemented the rural electrification program in Bangladesh through consumer cooperative society called Palli Bidut Samati (PBS). Due to the initiatives of REB along with the assistance from BPDB, people in the rural areas can enjoy the facilities of electricity now. However in order to provide electricity to remote villages, islands, coastal areas, hilly terrains and other inaccessible parts of the country, REB has executed decentralized mode of power distribution like standalone SHS. So far the REB has taken the following solar electrification projects in Bangladesh:

  1. Diffusion of Renewable Energy Technologies (Pilot Project) – This project provided electrification to Karimpur and Nazarpur unions of Narshingdi district by standalone and central charging station based solar systems. The total system capacity of this project was 62 Wp and various loads like domestic, commercial, social institutions and health center were connected to the system. Though after extension of grid electricity network most of the consumers of that solar system took grid electricity and returned their systems which are relocated in different PBSs. This project was funded by the GOB and French Government.
  1. Diffusion of Renewable Energy Technologies (2nd Phase) – This project will provide solar electrification to Austogram, Shingra, Kotalipara, Moheshkhali and Kutubdia upzilla and St. Martin islands. This is an ongoing project and is funded by the GOB and German Government.
  1. Rural Electrification through Solar Energy – This project has taken to provide electricity to consumers of 6 PBS areas of REB. The consumer target has fixed to about 16,000. It’s an ongoing project and it is funded by World Bank, IDA and GOB.

So far under the second and third projects REB has installed 1101 and 3415 SHSs respectively up to April, 2007(Directorate of Renewable Energy, REB, Dhaka, 20.06.07).

Local Government and Engineering Department (LGED):

The Local Government and Engineering Department (LGED) started solar PV electrification through UNDP supported Sustainable Environment Management Program (SEMP) and Japan International Cooperation Agency (JICA) supported cyclone shelter project. The LGED started Sustainable Rural Energy (SRE) project as a component of the SEMP of the Ministry of Environment and Forest (SRE, LGED, 5.6.07).Under the cyclone shelter project the LGED installed total 15.28 kWp capacities SHS at 1859 cyclone shelters in different coastal areas of Bangladesh. Under the SRE project, the LGED installed total 2.625 kWp capacities solar home lighting systems and two centralized PV systems (ibid). Besides that the LGED implemented the solar lantern program for poor rural households under that project. In order to electrify the remote islands like St. Martin, the LGED implemented 10 kW capacity solar-wind hybrid installations under the SRE project (ibid).

 Bangladesh Power Development Board (BPDB):

Bangladesh Power Development Board is the public organization engaged in generation, transmission and distribution of electricity throughout Bangladesh and it established in 1972. It contributes in utilization of PV technology for off-grid rural electrification especially in the Chittagong hill tracts area. It has PV installations of around 150 kWp under the solar electrification development program. This installed capacity includes SHS and centralized PV system. It has a future plan of electrifying remote off-grid villages and islands through PV technology in order to enhance electrification coverage in Bangladesh.

 Reasons for Slow growth of Solar Energy System in Bangladesh:

Solar power is not new to Bangladesh, since 1996 different companies have tried to market solar energy systems to the public. Yet in a technologically backward country like Bangladesh the idea took a fair while to gestate. Grameen Shakti likes to think of itself as one of the solar pioneers in Bangladesh, having started operations in 1996 they found the reality of solar energy difficult to deal with. The main hindrance behind slow expansion of the PV program is the very high cost of the systems.

Obstacles of Expansion of PV Technology in Rural Areas:

The major obstacles of rapid expansion of PV systems are as follows:

  • The problem with this technology is that the expectations almost always outweigh what the systems could achieve. Most thought a simple system could power an entire household quite easily. But after everything was explained thoroughly the main problem of solar energy was its price.
  • The lack of awareness about the PV technology requires long time, effort and money to familiarize the PV technology to the rural areas.
  • Private sector companies and NGOs may find it very difficult to cover the initial cost of dissemination of the technology, the main hindrance bring the high cost of system due to high price of the PV module in international market and imposition of government taxes.
  • An alternative to reach large number of rural households could have been developed with an easy financing system so that the buyers can pay the system price over a longer period of time (for example, 5 to 7 years). The implementing agency automatically requires soft fund to finance the customers, but source of soft finance is so far nonexistent.
    • Usually people show a lot of enthusiasms for this new technology and a desire to observe it more closely for a longer period. Many persons come forward to negotiate terms under which they can procure a system for themselves. In fact, there was huge gap between the financial affordability of rural people and the price of solar system. So, a suitable marketing mechanism is always required to reduce the gap. Presently Grameen Shakti is offering four types of solar systems for household use. The brief descriptions of these are given in Table 3.

Table 3: Brief description of solar systems Types of Solar System                      Wp = Watt peak.

Types of SHS

Usable Items Package Price (Tk.)

75 Wp

6 lamp (8 Watt each) and 1 B&W TV

34,500

50 Wp

4 lamp (8 Watt each) and 1 B&W TV

22,000

40 Wp

3 lamp (8 Watt each) and 1 B&W TV

17300

30 Wp

2 lamp (8 Watt each) and 1 B&W TV

12500

Source: Secondary, Documents provided by Grameen Shakti

The Grameen Shakti program made a cost analysis of the SHS taking the price of system, possible repairs, replacements, maintenance and depreciations. This led to several possible marketing strategies to be piloted by the program. Table 4 indicates the pricing options of SHS.

Table 4: Pricing Options for solar system

Sl No. Types of SHS Cash-package price (Tk.) Down payment (TK.) Loan amount (TK.) Monthly installment amount (36 installment) Monthly installment amount (24 installment) Monthly installment amount (12 installment)
01 75 Wp34,5005,86528,6351,0341,4322,625
02 50 Wp22,0003,74018,2606609131674
03 40 Wp17,3002,94114,3595197181317
04 30 Wp12,5002,12510,375375519951

Source: Secondary, Documents provided by Grameen Shakti

Experience of Rural Electrification Board (REB) Project:

(a) Customers prefer standalone system mainly due to higher quantity of energy available from the system and for convenience; batteries need not to be brought to the charging station;

 (b) Customers prefer relatively larger system (46 Wp and above);

 (c) Charging stations may be considered as a failure. Customers do not like to frequently charge          batteries from charging stations. It is very inconvenient to bring batteries from far flung       areas. Many batteries have been damaged due over discharge.

Socio Economic Impact of Solar Energy:

Socio-economic development is the process of social and economic development in a society, which is measured with indicators, such as GDP, life expectancy, literacy and levels of employment. The electricity makes a significant impact on rural community from socio-economic perspective. Among different aspects of socio-economic impacts of rural electrification, some aspects are highlighted in this study.

Besides electrification other basic infrastructure development is necessary for positive socioeconomic impact on rural community. The degree of impact varies with the location of the study area, availability of basic infrastructure and mode of electrification in the local community.

In this case the authors wanted to quantify the socio economic impact that solar energy usage has on Bangladeshi society, especially the rural one.

Lighting Facilities Before and After SHS :           

Lighting and entertainment facilities usually available in a typical village before using the solar home systems in the study villages are given in the Table 5.1. It is shown that 35% of respondents are using some sort of kerosene lamps for their household lighting. On the other hand, 40% of the users use dry cell batteries for torch lights and radios. For watching TV, 15% of the participants use car batteries.

 

Study Area

Kerosene

 

Lamp

Dry cell

 

Battery

Kerosene

 

Pressure

Car

 

Battery

Wick &

 

Kerosene

 

 

Lamp

 Lamp

 

 

Niz Mawna(Village)

39

36

9

6

Micro Enterprise

3

2

5

3

Barabo

9

8

3

1

Total Respondent

51

46

5

12

10

% of Respondent

77

70

8

18

15

Source: Secondary, Mondal (2005)

After the solar home system installation, the scenario changed.  Nobody was using kerosene pressure lamps and car batteries for lighting and entertainment purposes. Reduction of Kerosene was the main impact of the solar home system that results less pollution, less darkness, less hassle and in addition less work for cleaning kerosene lamps as well. Charging of the car batteries was more time consuming with respect to present situation whether charging was being done automatically remained connected with TV. Dry cell batteries were still common in use at night for torch lights to facilitate communication. Among the respondents, 5% were still habituated with kerosene lamps for lighting purposes in whole night.

 Impact on Lifestyle:

The   daily   working   activities     changed after introducing of solar home systems in the stated study areas. Better quality of light provided opportunities for studying and refreshment as well as gossiping activities, for watching TV or listening to broadcast information and entertainment by the radio. It is shown from the Table 5.3 that at present children could study additional two and half (2.5) hours with this facility. Three household respondents made their opinion that their children’s performance of study was better than previous. On the other hand, all respondents remarked that their evening working hours were extended.

Table6: Number of Hours/day for Social Activities before and after SHS

 

Social Activities

Number of Hours per Day
Before SHSAfter SHSChange
TV watching24/5+ 2/3
Listening radio23+1
Children

studying

1.54+ 2.5
Sewing02+ 2
Chatting02+ 2
Sleeping time8/96/7– 2

   Source: Mondol (2005)

Income Generation Activities, Poverty, and Income Distribution:

There is a positive relation between the income generation and the exposure of people to sources of power in the rural areas. Income generation activities are created after acquiring the solar home systems in villages. The people engaged in doing business using traditional fuel now switch to solar light that results in more development of their business than before. Medical pharmacies in and mobile phone service centers are established due to installation of solar home systems. Tailoring machines are bought to earn some money.

Women become involved with income generation activities. Grocery shop owners who were using kerosene lamps for their business get working hours extended due to SHS.

As more and more income generating facilities and opportunities are created due to the introduction of solar energy in villages, solar energy has the potential to reduce poverty in rural areas. It can also play a role in balancing income distribution in a great way in a given village.

Table 7: Income Generation Activity Hours Before and After the SHS

 

Income Generation Activities

Number of Hours
Before SHSAfter SHSChange
Sewing01+ 1
Tailoring (HH)02+ 2
Tailoring (Shop)34+ 1
Mobile phone business012+ 12
Grocery shop (Used Kerosene lamp)24+ 2
Grocery shop (Used Pressure Lamp)34+ 1
Furniture shop13+ 2
Pharmacy03+ 3

     Source: Secondary, Mondal (2005)

Impact on Household Assets:

Households acquire color television after the solar home system installation (Table 5.5). Radio and cassette increases after the solar system installation. Mobile phone uses increases. Most popular item for the households is television. After installation of solar home system, in a survey by Md. Alam Hossain Mondal, the individual household TV increased to 52%, meaning that buying rate of TV was increased by 41%. Mobile phone was another interesting item for communication. Network was not available in the study villages, but eight of the SHS users out of total surveyed people were using mobile phones by using small antenna for getting network and they used the solar facility for charging. The telecommunication system was improved significantly due to SHS. In the rural area, people could communicate with their near and dear easily. The respondent could know the news of the country by watching TV and listening to radio.

Impact on Literacy and Education:

Solar energy in households like any other form of energy enhances opportunities for connecting to the world and education. People in a electrified village is much more prone to be educated as they learn to become more competitive by gaining access to developed areas. And solar energy helps people in study related areas in more than one can think of.

Prospect of Solar System in Bangladesh:

Government Initiative2    :                            

Government strategy emphasizes promoting off-grid options in areas that are unsuitable for grid expansion. It has made a good start by eliminating import duty on SHS in April 2000. The strategy emphasizes the pivotal role of well functioning rural systems for the Government’s off grid promotion strategy and endorses the approach to use well-functioning rural community based organizations (CBOs) to leverage grass-roots reach and establish credibility to improve electricity provision significantly.

The objective of this Clean Development Mechanism (CDM) project is to contribute to sustainable development through the provision of renewable solar electricity to households not connected to the electricity grid and thereby reduce the Greenhouse Gas (GHG) emissions by displacing kerosene and diesel use for lighting and off-grid electricity generation.

The project will contribute to the sustainable development of Bangladesh with a particular emphasis on the rural population, which is generally poorer.  In addition to reducing GHG emissions, the project would have significant other social, economic and environmental benefits.  Bank’s involvement in supporting this project is therefore considered highly appropriate.

The project envisages installing 929,169 SHSs all across Bangladesh between 2007 and 2015.  The SHS will provide facilities for lighting, TV and radio and comprise of: (a) a Solar Module (10 to 120wp); (b) battery (47 Ah to 130 Ah); (c) Charge Controller; (d) fluorescent tube lights with special electronic ballasts; (e) mounting structure; (f) installation kit; and (g) cables and connecting devices. The capacity of individual SHS will vary according to consumer choice and demand. The cost of SHS would be recovered through monthly installments over a period of up to 4 years which will be within the affordable capacity of the targeted consumers.

Bangladesh’s Solar Energy by Gordon Feller, Urban Age Institute, January 18

Upon full implementation in year 2015, the project activity will replace 20,075 kilolitres per annum of kerosene usage, equivalent to an emissions reduction of 48,380.75 tones CO2 per annum and 16,600,500 KWh/ year of electricity generation using diesel generators.

The project will be implemented by Grameen Shakti (GS) which develops, introduces and popularizes renewable energy technologies for sustainable energy solutions, particularly Solar PV systems, aiming to reduce poverty, improve living standards and protect the environment.

Over the last decade GS has installed about 77,000 SHS with combined capacities of 15.8 MW and more than 1,650 SHSs are installed each month.  It has also set up 120 offices for service delivery and performance monitoring, and has a research unit for improvement of the overall efficiency of the system and ancillaries. GS is currently serving more than 275,000 beneficiaries through its 120 offices spread over 58 districts of Bangladesh.

Status of Application of PV Technology in Bangladesh:

In Bangladesh, the applicability of standalone SHS is more than others. The remote and scattered clusters of rural households make the SHS more appropriate for electrification.

IDCOL is the main financing organization in the renewable energy sector and it contributes in dissemination of renewable technology through partner organizations in Bangladesh. So far 116,448 SHSs have been installed by different NGOs throughout Bangladesh and a target of installation of 200,000 SHSs will be implemented by the year 2009. Besides NGOs, government organizations like the REB have installed 3521 SHSs in Bangladesh under different renewable energy projects26. Till January, 2005, the total PV installation capacity of the Bangladesh Power Development Board (BPDP) was 56 kWp in the Chittagong hill tracts region and it is expected to install around 150 kWp in near future. The Local Government and Engineering Department (LGED) so far installed 35.6 kWp solar installations in Bangladesh. It is to be mentioned that for both the BPDB and LGED, the total PV installations include various applications like SHS, centralized solar electrification, solar water pumping and others. The centralized solar electrification programs are implemented by some government organizations with the assistance from donor organizations. So far six centralized solar electrification projects were implemented in Bangladesh and they were implemented by the BPDB and LGED. These projects were implemented to determine the viability of the centralized PV technology for remote rural electrification.

Potential market for PV technology:

Bangladesh has a potential market for utilization of PV technology for off-grid electrification purposes. According to a market survey (funded by World Bank) in 1998, there is an existing market size of 0.5 million households for SHSs on a fee-for-service basis in the off-grid areas of Bangladesh. In most of the developing countries it has been observed that households spend no more than 5% of their income for lighting and usage of small appliances. According to that about 4.8 million rural households in Bangladesh could pay for a solar home system. It is estimated that 10,000 rural markets and commercial centers which are about 50% of all rural markets in the country are electrified by conventional grid electricity. The centralized PV system has good electrification potential for the off-grid rural markets and commercial centers. In off-grid rural markets and commercial centers, the electricity is mainly provided from private owned diesel generator operators and it has been found that 82% of them are interested in marketing SHS in surrounding areas if favorable financing arrangements are available (World Bank, 2000). Different government and non-government offices, health centers, schools, banks, police stations etc in the off-grid areas use traditional means of lighting like lantern, candles, kerosene wick lamps etc or they have their own diesel generator set. These offices have separate budgets for electricity which can be used for electrification through PV technology. The estimated short to midterm market potential of the PV technology in Bangladesh is about 60 MW. This estimation considers the various applications of PV technology like pumping, signaling, telecommunication besides conventional rural electrification. The chart 1 shows the relative distribution of the projected existing market for SHS within the administrative divisions of Bangladesh.

Source: Khan et al. (2005), p. 98

Chart 1: Projection of the SHS Market in Bangladesh:

The estimation of market potential is based on operating experience of other developing countries like India, Sri Lanka where PV technology is techno-economically attractive for different applications irrespective of high initial cost of solar installations. This market potential is determined on short to midterm basis however the actual market potential is dependent on the price of the solar PV system. The commercialization and widespread application of solar electrification depend on the potential of the market in the context of socio-economic condition, attitude and preference of people and above all the energy usage pattern in the rural area.

Impact of Further Growth in Solar Energy Sector on Present Power 

       Distribution System:

Today’s Bangladesh is featured with load shedding problem and now, people in Bangladesh are living with some worst load shedding memories. As Bangladesh is a densely populated country, things should have been changed before any depressing thing emerges. Though solar power is not new in Bangladesh, people yet are not using it as a pure alternative of load shedding problem. In Bangladesh, Grameen Shakti is popular for awareness and implementation of solar power in some rural areas.

In Bangladesh, power demand amounts to 5500 megawatt unofficially and 4600 megawatt officially. But the power plant under Power Development Board (PDB) can generate only around 3600 megawatt (mw).Now, with the gas crisis, the PDB cannot generate 500 to 800 mw.Earlier in April 2009, PDB had all the gas supply it needed and it could generate a record 4200 mw power just for one day. It has been proved by many researches that Bangladesh is not suitable for wind or coal power because of high cost. Thus solar power is the only alternative(Power Failure; Weekly Publications of Daily Star, April 17,2009).

According to the interview with Grameen Shakti, it has been revealed that, initially, people were simply interested in how the sun could provide electricity but now, with different awareness program generation, from 1996 to till now, Grameen Shakti has been successful to make people understand and thus is succeeded in installing solar power system in many rural areas of Bangladesh. From the secondary sources provided by Grameen Shakti, following statistics about installation of solar home system has been found.

Distribution System

Chart 2: Growth of Solar Users:

According to the above graph, up to 2008, cumulatively more than 0.2 million solar home system has been installed in rural areas of Bangladesh. According to Grameen Shakti, solar home system (SHS) is very popular in market place as micro utility.50 Watt systems can rent lights to 3 more shops. Also, SHS helps to replace kerosene. A 40 watt system can replace about 20 Tk. kerosene cost per day. Average installments are per month Tk515.

To promote solar energy among rural people, different organization such as Brac, RahimAfrooz is coming forward with SHS program. Following graph shows the number and name of organizations installed solar system in different areas.

Growth of Solar Users

Market Share of Solar Energy Providers:

With a view to developing renewable energy resources to meet 5% of total power demand by 2015 and 10% by 2020,Bangladesh government has already declared solar panel as duty free in the upcoming budget of 2009-2010.Government in every year has been providing facilities so that people can use solar energy. Following graph shows the number of SHS installed in different divisions of Bangladesh up to December 2008. Thus, though not million or billions of SHS yet, current number of SHS installation is providing backup to the current power demand as the country’s population is increasing

Market Share of Solar Energy Providers

Chart 4: Division wise installations of SHSs (21 December 2008):

From the above graphs, it is clear that, using solar energy is getting importance and day by day, the number of installation is increasing.Dipal Chandra Barua, managing director,Grameen Shakti said that, it is his dream to empower 75 million people through renewable energy technologies and Grameen Shakti has selected its vision for 2015 which includes a whopping 7.5 million solar home system to be installed and a massive 100,000 green jobs to be created(Our Solar Solution?; Weekly Publications of Daily Star, May 15,2009).

Further growth in the solar energy sector has a great impact on the present power system in Bangladesh. Solar power system is lessening the burden on gas, fulfilling country’s power demand and decreasing the amount of other resource consumption such as kerosene. Solar power can be used to electrify computer centres and other workplace also. Solar power is harmless for environment and human being. Thus the further growth of solar system may reduce this massive load shedding by providing harmless continuous energy supply. If not full, the solar energy system installation can meet almost half of the electricity demand in Bangladesh which is the urgent need for the country. Another thing is, solar energy is renewable means as sun is not a miser in disseminating its light. Thus there will be no shout for electricity one day if our country can implement a Solar Bangladesh Concept as Mr. Dipal Barua’s dreams will come true.

Conclusion and Recommendation:

Providing electricity for meeting lighting needs of households and rural markets can bring several positive impacts including improvement of quality of life and increasing in income and employment opportunities. So, rural electrification through solar energy is a model to the users is that they are free from the responsibility of maintaining the system. The risk of the whole system has been avoided with the involvement of local community in management. Demonstration of solar energy system has been successful to create interest among the rural people and demand from other location also observed.Solar Energy

Following are the recommendations that might be applied for smooth growth of rural electrification through solar energy:

  • Rural people in Bangladesh are not aware of the solar energy technology. Therefore demonstration is necessary to reach the information to this group.
  • Appropriate financial arrangement is necessary for the rural people to afford the system. This may include payment in installment, fee for services and other suitable modes.
  • Users  training  has  great  impact  as  the  users  can  do  trouble  shooting  of  minor problems like replacing fuse, adding distilled water, replacing bulbs etc. This may avoid technician call and increase system reliability.
  • Solar systems with different options should be available to the consumers so that they can choose themselves according to their demand.
  • Technician training is essential for ensuring the local technical support as well as to make the project sustainable.
  • Women also should be invited for training, as they are the main users of the systems.
  • They can also pay attention for maintenance.
  • Components/accessories of solar systems should be locally available so that the users can buy them easily when required. This can increase acceptability of the technology to the users.